About Valor Fireplaces
Valor builds specification-led gas and electric fireplace systems for residential construction, renovation, and light commercial lounges. We publish BTU/hr, clearances, and insert dimensions so purchasing teams compare SKUs the same way they compare R-value and fire resistance rating—before finishes lock in.
Teams ask whether natural stone surrounds or engineered panel skins better suit a feature wall. Valor answers the heat and vent half of that question: listed clearances, dimensional stability under heat cycles, and service life expectancy of burners or LED media. Finish geology stays with the millwork package. When green-building premiums conflict with budget reality, we show code-compliant standard assemblies next to optional higher-efficiency gas paths instead of forcing a single narrative.
Roofing trades coordinate vertical terminations with wind load rating and moisture vapor transmission details. Valor chase notes reduce thermal bridging surprises at attic interfaces. Production builders use the same tables for repeatable SKUs across elevations; hospitality projects add lounge-specific BTU and control notes so mechanical engineers and interior designers stop arguing from incomplete sheets.
Timeline that shaped the Valor documentation stack
- 1984–1996 — Field notebooks from Pacific Northwest installs drove the first published clearance matrices for mid-size direct-vent gas fireplaces (typical 18,000–40,000 BTU/hr input bands).
- 2004 — Insert framing sheets standardized opening width/height, hearth extension, and liner callouts so renovation GCs could takeoff masonry cavities before ordering.
- 2012 — Electric media path added 120 V / 1,500 W (~5,000 BTU/hr equivalent) rows with VOC emissions context for multifamily corridors that cannot accept new combustion vents.
- 2018–2023 — Roofing Materials interface packets added ASTM E108 Class A context, wind load rating checkpoints, and moisture vapor transmission notes at chase/roof junctions.
Scope limits we state up front
Valor fireplace listings do not replace partition fire resistance rating or wall STC rating—those remain on the architectural/acoustic schedules. Gas units require listed vent paths and fuel pressure within orifice kit ranges; electric media heaters are not whole-home heating replacements. Prefabricated chase kits shorten install time but reduce field flexibility versus stick-built surrounds. High-efficiency kits can add material cost without proportional ROI on every production elevation—document them as priced alternates when budgets are tight.
Listings referenced on Valor packages
- CSA / ANSI Z21.88 — vented gas fireplace heaters
- UL 127 / UL 907 — factory-built fireplace reference context
- ENERGY STAR — select high-efficiency gas fireplace models
- Intertek / ETL — electric fireplace electrical listings
- ASTM E108 — Class A roof assembly context for chase terminations
Talk to the Valor spec desk
Share model family, fuel type, and project city. We return cut-sheet IDs and clearance notes.
Contact Valor