Valor specification sheets and fireplace samples on a drafting table

Specs

Valor Specification Comparison Tool

Filterable product data for gas fireplaces, electric units, inserts, and roofing chase interfaces—with downloadable spec sheets and quick-quote links for purchasing and design teams.

Numbers first. Brochures later.

Every row below lists a measurable parameter: input BTU/hr, vent type, clearance, or framing size. Download the matching submittal when you need a PDF for the binder. Quick-quote links route the same SKU IDs to the Valor spec desk.

Heat clarity

Gas input bands from 12,000–55,000 BTU/hr and electric heat equivalents sit beside fuel kit notes so estimators do not guess orifice sizes.

Vent & clearance IDs

Direct-vent, B-vent, and electric non-vent paths live next to listed mantel and side clearances for CSA / ANSI packages.

Spec sheet downloads

Request cut sheets for portrait gas units, inserts, electric media, and roofing chase interfaces through the quote desk with filterable SKU tags.

Data package completeness

Internal checklist for each SKU family before it appears in the comparison table. Percentages reflect documentation coverage, not marketing scores.

BTU + fuel kit data 100%
Vent & clearance callouts 97%
Insert framing dimensions 94%
Roofing chase interface notes 88%
Family Fuel / power BTU / heat Vent / notes Action
Portrait gas fireplace Natural gas / propane 18,000–35,000 BTU/hr Direct-vent coaxial Quick quote
Linear gas fireplace Natural gas / propane 20,000–40,000 BTU/hr Direct-vent, wide glass Quick quote
Gas fireplace insert Natural gas / propane 20,000–34,000 BTU/hr Liner + listed clearances Quick quote
Electric wall fireplace 120 V / 1,500 W ~5,000 BTU/hr equiv. No combustion vent Quick quote
Electric insert 120 V media heater ~5,000 BTU/hr equiv. Existing opening retrofit Quick quote
Roof chase flashing kit N/A — envelope N/A Wind + moisture notes Quick quote

Filter rows client-side for desk use. Official submittals ship as PDF cut sheets after quote routing. Domestic lead times versus import alternates should be stated in the message when ship dates are firm—hospitality lounge downtime often outweighs a unit price gap. Chase insulation notes address thermal bridging and moisture vapor transmission at attic interfaces; fire resistance rating still belongs to the wall/roof assembly schedule, not the fireplace listing alone. Wind load rating of the roofing system must accept the termination hardware before crews cut the deck.

When green-building premiums conflict with budget reality, keep the code-compliant standard gas assembly on the base bid and list high-efficiency kits as priced alternates. Natural stone surrounds versus engineered panel skins remain a finish-scope choice; Valor sheets document clearances and dimensional stability under heat cycles so millwork packages do not invent numbers. Electric paths disclose VOC emissions context for finish schedules and service life expectancy of LED media assemblies—useful when combustion venting is not in the envelope.

Selection considerations & technical trade-offs

Natural surrounds vs engineered skins: natural materials win on unique aesthetics and perceived longevity; engineered panels win on consistency, stain resistance, and lifecycle cost. Valor publishes clearance and dimensional stability data either way—finish selection remains millwork scope.

Prefabricated chase vs traditional field build: prefab reduces on-site waste and labor hours; traditional surrounds allow late design changes and easier field mods. Vent path length and roof penetration geometry decide which path still fits listed terminations.

Green premium vs budget pragmatism: ENERGY STAR select gas models and thicker chase insulation can raise material cost 10–20% on some packages without proportional ROI on every elevation. Keep code-compliant assemblies on the base bid; list higher-efficiency kits as alternates with published BTU/hr and fuel notes.

Known performance boundaries

  • Heat duty: Electric 1,500 W media (~5,000 BTU/hr equivalent) is not a substitute for 18,000–40,000 BTU/hr gas heating in great rooms.
  • Envelope: Fireplace listing ≠ wall/roof fire resistance rating; ASTM E108 Class A context applies to the roofing assembly, not the appliance alone.
  • Install: Mantel clearances assume listed depths; deeper custom mantels require re-check. Horizontal vent runs need sufficient rise and termination clearances—do not force a path that violates the cut sheet.
  • Climate: Freeze-thaw and high-wind sites need moisture vapor transmission and wind load rating coordination before deck cuts; coastal salt exposure may shorten unprotected termination hardware life.

How to verify a Valor row

Request free cut-sheet PDFs and, where available, sample media or burner photos against the SKU ID. Application engineers will walk fuel pressure, orifice kit, vent diameter, and insert opening dimensions against your framing sketch. Reproduce the check on site with a tape measure for mantel/side clearances and a fuel-pressure gauge at the valve—match readings to the sheet before finishes close the chase.

Listing marks on downloadable sheets

CSA Z21.88Gas fireplace heaters
UL 127Factory-built context
ENERGY STARSelect gas models
ETLElectric listings

Download Spec Sheets or Request a Quick Quote

Tell us family, fuel, and project city. We return PDF IDs and clearance notes matched to your shortlist.